Hazardous
Storage Room
Converted
an existing 2nd floor cold room into a Class I Div I hazardous storage
room. Project involved converting existing walls, floors and ceilings
into a 2-hour assembly, installation of a gas detection system, a 2-hour
protection of existing beams and columns of structure below, and
renovation of framing and structure above occupied first floor rooms. |
|
|
|
Hazardous Storage and
Dispensing Room
Converted an
existing 2nd floor cold room into a Class I Div I hazardous storage and
dispensing room. Project involved converting existing walls, floor and
ceiling to a 2-hour assembly, installation of Class I Div I fume hood,
and a gas detection system. |
3rd Floor
Offices
Construction
of 13 new offices and 12 new cubicle office spaces in an occupied
high-end tenant space. Mechanical and electrical trades were
design-build, and project was completed off-hours to minimize disruption
of surrounding tenants. |
|
|
|
Solvent
Waste/Hazardous Materials
Converted an
existing 232,000 s.f. building into 4 control zones. Construction
included creating area separation locations, upgrading walls at proposed
area separation locations and adding new partitions, doors, fire stops,
and fire dampers at interstitial levels, as well as converting existing
labs and offices into new interior hazardous storage rooms and 2
exterior hazardous storage and dispensing rooms. All hazardous storage
rooms are 2-hour assemblies with gas detection systems, smoke fire
dampers, and emergency exhaust shut-offs. Existing penetrations required
fire stopping to complete the 1-hour occupancy separation between
control zones. All construction efforts conducted in a manner that did
not disrupt building operations. |
|
Exterior
Hazardous Storage Rooms
Converted an
existing storage area to H2/H3/H7 hazardous storage and dispensing
rooms. Construction
included installation of new Sarnafil roof, new exhaust system with
emergency shut offs, and a gas detection system. Project also included
converting existing walls, ceiling, and floors to a 2-hour assembly. |
|
|
Fume Hood
Replacement
Removed two
12’ bench top fume hoods and replacement with three 8’ walk in fume
hoods. Project was completed in an occupied lab with extensive upgrades
to both supply and exhaust air systems. |
|
Backfill
A
3-phase modification and renovation of existing 146,00 s.f. laboratory
facility. Construction included reconfiguring existing labs to
accommodate new requirements and creating building control zones to
bring the facility into compliance with governing bodies. Converted the
2nd floor space into 2 control zones, and added 3 hazardous storage
rooms. Construction included upgrading walls at proposed area separation
locations and adding new partitions, doors, fire stops, and fire dampers
at interstitial levels. Upgraded existing mechanical, electrical, and
plumbing utilities as well as the installed the first ever prototype
solvent waste system that has set the industry standard for a double
contained drainage and vent system. The system dispenses highly
flammable liquids from HPLC units to an exterior double contained
storage tank via welded stainless steel pipe and a series of lift
stations, all which are monitored and controlled by the building
management system. All construction efforts conducted in a manner that
did not disrupt building operations. |
|
|
|
Re-Cabling
and Under Room Upgrades
Renovation
and upgrade of the intra-building CIS cable plant to a Lucent
Technologies, Systimax “Structural Cabling System (SCS)” to
integrate all voice, data and other low voltage signals onto a common
distribution platform. |
Misc. Lab
Reconfigurations
Reconfiguration
and rearrangement of 12 existing labs in building 25. Construction was
completed while maintaining existing operations. |
|
|
|
Basement
Converted
32,000 s.f of an existing underground parking area into new offices and
laboratories. Project included structural upgrades of parking structure
deck to reduce vibration within the building. Transferred and installed
an emergency generator from a Colorado facility, added a UPS system and
state of-the-art research and development laboratories, constructed a
new subterranean patio to allow natural light into the underground
office area, and added new storage areas for materials and archives. New
GMP certified mechanical, electrical, and plumbing services were
installed including a new air handling unit, new laboratory gas systems,
and new deionized water system. As a part of the project, new support
utility systems were incorporated in parallel redundancy. All
construction efforts conducted in a manner that did not disrupt
laboratory operations. |
|
NMR and
Freezer Farm
Build-out of
existing building 25 subterranean parking facility to accommodate
Freezer Farm, Storage, and NMR expansions. |
|
|
Expansion
Four phase
construction management project. The project entailed expanding an
existing data center, while keeping the system on line, and a seismic
retrofit to an adjacent building. Completely new renovations were
included in each phase. |
Campus
Two-story
addition to the most critical building on the Amgen campus which is
their main drug manufacturing facility. |
|
|
Administration
Building
Complete
build-out to the lower floor of an administration bldg. Project included
a new security system for the floor and an adjacent parking structure. |
Renovation
Renovation to
biochemical laboratories and product storage rooms. |
|
|
Various Renovations
Renovations
and improvements to over 22,000 s.f. of laboratories and office space.
The projects also included new construction of a two-story, 5,000 s.f.
addition. |