Construction, Inc - Rated Number 3
Aerospace Facility Contractor
in ENR's 2002 Top
400 Contractors Sourcebook
|
Lab Optimization
Construction
of a two level, office and audiovisual arena for a top-secret simulation
laboratory.
Project involves construction of STC 55 rated perimeters/ceilings
with extensive security access and monitoring throughout, new mechanical
equipment and steel platform constructed on the roof, raised access
flooring, all new fire
sprinkler supplies, including a preaction system, and high end restrooms
built on the ground floor. |
|
|
Numerous Laminar Flow Paint Application Facilities
& Building Expansions
Design-build,
new structural steel building and spray booths. Largest in Southern
California. Explosion proof construction and devices throughout.
Extensive makeup air and exhaust air system, meets AQMD specifications.
New paint mixing room, state-of-the-art laminar flow hepa filter.
Breathing air systems with complex controls, monitoring and alarms.
Several completed during El Nino. |
|