TG
Construction, Inc - Rated Number 3
Aerospace Facility Contractor
in ENR's 2002 Top
400 Contractors Sourcebook
|
EKV Cleanrooms Production Facility Relocation and
Modification
Our firm was
responsible for the design, engineering, and construction of the entire
classified area. Three-phase project. The first phase primarily related
to the existing office area location and facility modifications. The
second phase involved the work required in the burn production areas.
Phased relocation of approx. 200,000 s.f. of class 100,000. 10,000,
1,000 and 100 clean rooms. Included 3 new modular clean rooms and the
relocation of over 2000 pieces of laboratory equipment. |
|
|
Microwave Integrated Circuit Lab
Relocated
Microwave Integrated Circuit Lab from Fullerton, CA to El Segundo, CA.
38,000 square foot project with RF shielding, process piping (LN2, Lab
Gases), utility walls, relocation of existing equipment from the
Fullerton, CA laboratories. RF shielded rooms were dismantled,
transported, and re-assembled in the finished space. Build-out of labs
and offices. Project included completely gutting entire area and
rebuilding in an area with limited access and occupied areas surrounding
the job site. |
Complete
Building Remodel
Complete
remodel, interior demolition and fit-up of 75,000 square foot space. |
|
|
Test Facility
Housing
Competitively
bid project, part of the SBIRS program. Construction included a 60’ x
30’ x 30’ deep pit to house a payload test facility. Class 10,000
clean room and computer control room. |
|