TG
Construction, Inc - Rated Number 3
Aerospace Facility Contractor
in ENR's 2002 Top
400 Contractors Sourcebook
|
High Bay Annex
New
facility, satellite manufacturing and assembly. Construction of a 10,500
s.f. high bay, class 100,000 clean room facility. Structural steel frame
with metal siding, roof equipment platforms, and 20-ton overhead bridge
crane with an 82' span. Ceiling height of clean room is 75'. Building
is supported on engineered fill with cast-in-place concrete piles. |
|
|
Air-Handling
Unit Installation
Installation
of seven new air-handling units on the roof of a low bay facility. The
project involved new steel platform construction beneath the existing
units while kept in operation. |
Telecommunications
Installation
Installation
and implementation of a new Northern Communications Telephone System and
Integrated Data Exchange (a digital fiber network and PBX system). |
|
|
Chip
Manufacturing Facility
Buildout of a
class 100 cleanroom. 2,000 s.f. Surrounded by occupied existing
cleanrooms. This clean room is used for manufacturing the new Indium
phosphite chip. |
Build-out
Build-out of
four MBE class 1000 cleanrooms over the last 18 months. Construction
included cleanroom rated bridge cranes and a thermal oxidizer system. |
|
|